(403) 230-1014 [email protected]
The mill work is arriving!

The mill work is arriving!

This is the first day of mill work arriving on site. There is a natural walnut entertainment unit that will compliment the future stone fireplace. The mill work throughout the home will be finished on site. The area was enclosed on top with a triangle shaped drywall...
Insulation Day

Insulation Day

A combination of spray foam and batt insulation will improve the energy efficiencies of the home. One discovery when we started demo was many of the original walls did not contain any insulation! Once all of the attic work is complete we will also add blown...
Creating a Service Raceway

Creating a Service Raceway

At the rough-in stage we are now installing plumbing, electrical and gas requirements. The addition of a gas range and an outdoor patio heater will require additional gas lines. Our scope of renovation does not include any redevelopment in the basement. The ceilings...
A Wall Hung Toilet

A Wall Hung Toilet

With a young active household the choice of finishes and fixtures was very important. No one wants to be a slave to cleaning! Wall hung toilets were chosen to install at a preferred height and provide easier cleaning with smooth and minimal surfaces. At the rough-in...
Let there be light

Let there be light

We have previously discussed the relocation of the Master suite to the main floor and the creation of the en suite. It has moved to a corner of the house that did not have any natural light. Today the window was cut out and the light has come streaming in this corner....