The on-site staining is now in progress. The kitchen cabinets and beams are requiring one more coat of lacquer. A pass-through access was added to access the mudroom recycling deposit bin. This container can then be removed and disposed of from the mudroom. A paint grade panel painted to match the wall color will disguise this feature nicely. From this side you can see the west wall of cabinets with the kitchen sink and window. The brackets are installed on the island end ready to receive the butcher block top. The easterly cooking wall contains the ovens and pantry access.