Millrise Dental
Services Used:
-
Interior Design & Planning
- Project Management
- Interior Furniture and Furnishings
Challenge:
This is a very productive office, 10 ops, 3 doctors and open six days a week and then the unthinkable happened and someone drove their car through the front window into reception and the waiting room. No one was hurt but repairs were required and an opportunity presented itself to make some improvements at the same time. The timeline had to have the renovations taking place over the Christmas holidays with minimal closure time. Additional seating in the waiting room was a high priority and a staff room to accommodate the people and personal storage was needed. By implementing technology improvements also more workstations and storage could be provided. When complete the owners hoped for an updated look while preserving the majority of the existing finishes that would not be modified.
The Solution:
RODI Results:
Decca Design’s renovation of this dental clinic is a prime example of RODI achieved through strategic space maximization and workflow enhancement. The introduction of a new reception desk, reconfigured seating in the waiting room, and a more efficient staff area not only addressed the immediate repair needs but also significantly improved the clinic’s functionality. Implementing technology improvements and storage solutions further optimized the space. Despite the tight Christmas holiday schedule, the clinic was successfully updated with minimal closure time, demonstrating Decca Design’s expertise in managing renovations efficiently, even under challenging circumstances. The result is a dental clinic better equipped to handle its high patient volume while maintaining a refreshed and inviting environment.